USI provided design build construction services for replacement of a total of 12 pumps serving the main chiller plant at a major lab and office facility in Boston. Pre-planning and phasing of the work allowed the project to be completed with only one shut down of the building chilled water system…
Read MoreUSI collaborated with a Design-Build General Contractor to outfit multiple new floors at this local Pharmaceutical Lab facility. We installed an extensive amount of ductwork and refrigerant piping as well as multiple Daikin VRV unit systems, Valent DOAS units, HEPA filtration systems and DriSteem electric humidifiers for process and controlled environmental testing rooms[…]
Read MoreUSI was contacted by a Preventative Maintenance Contract Client to replace an aging 80-ton liquid cooled chiller at a peripheral property. We worked with building management and the on-site facilities team to design and select a suitable Carrier replacement for this existing McQuay chiller{…}
Read MoreUSI replaced two large Carrier Rooftop Units at a very high-profile location in the Fenway-Kenmore neighborhood. A great deal of coordination with the City of Boston as well as the property owner went into this project due to its location, necessary street closings and size of the crane that was used[…]
Read MoreReplacement of a 70-Ton Carrier Chiller at a Senior Living Community in NH. Due to the historic significance of this building, USI had to work closely with the local Municipality to ensure proper [...]
Read MoreUSI recently completed a weekend replacement of a large Cooling Tower in Charlestown. The tenants in our clients building required cooling operations 24/7. As a result, we mobilized the necessary [...]
Read MoreDuring the initial onset of COVID19 in May 2020, one of USI’s clients experienced a catastrophic failure of a Cooling Tower serving their Residential property in Cambridge, MA. […]
Read More