Replacement of Boilers, Tankless Water Heaters and Pumps at large multi-use facility in Manchester, NH.
USI was awarded a project to replace two 810,000 Btu Weil McLain boilers, two 199,000 Btu Navien tankless water heaters, one 45 gallon HTP storage tank, three Taco hot water pumps and a 15kw Dayton electric heater for a separate space at a previously restored mill building that is now a multi-use commercial and residential building located in the heart of Manchester, NH.
We worked directly with our valued client to meet a pre-set construction schedule in order to minimize downtime and service interruptions for the tenants of the large building.